The amount of work done in forming a soap film of size $10\,cm \times 10\,cm$ is (Surface tension $T = 3 \times 10^{-2}\,N/m$).

  • A
    $6 \times 10^{-4}\,J$
  • B
    $3 \times 10^{-4}\,J$
  • C
    $6 \times 10^{-3}\,J$
  • D
    $3 \times 10^{-2}\,J$

Explore More

Similar Questions

Work done in increasing the size of a soap bubble from a radius of $3 \ cm$ to $5 \ cm$ in millijoules is nearly (surface tension of soap solution $= 0.03 \ Nm^{-1}$) (in $\pi$)

One thousand small water drops of equal radii combine to form a big drop. The ratio of final surface energy to the total initial surface energy is

The amount of work done in blowing a soap bubble such that its diameter increases from $d_1$ to $d_2$ is ($T=$ surface tension of soap solution).

Surface tension of a soap solution is $1.9 \times 10^{-2} \text{ N/m}$. The work done in blowing a soap bubble of $2.0 \text{ cm}$ diameter will be:

The amount of work done in blowing a soap bubble such that its diameter increases from $d$ to $D$ is ($T=$ surface tension of solution).

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo