$A$ horizontal force of $5 \,N$ is required to maintain a velocity of $2 \,m/s$ for a block of $10 \,kg$ mass sliding over a rough surface. The work done by this force in one minute is $J$.

  • A
    $600$
  • B
    $60$
  • C
    $6$
  • D
    $6000$

Explore More

Similar Questions

You lift a heavy book from the floor of the room and keep it in the bookshelf having a height of $2 \, m$. In this process,you take $5 \, s$. The work done by you will depend upon:

Explain work done by a constant force.

$A$ person draws water from a $5\,m$ deep well using a bucket of mass $2\,kg$ and capacity $8\,litre$ with a rope of mass $1\,kg.$ What is the total work done by the person? (Assume $g = 10\,m/s^2$ and the density of water is $1\,kg/litre$.)

Difficult
View Solution

$A$ force acts on a $30 \,g$ particle in such a way that the position of the particle as a function of time is given by $x = \alpha t^2$, where $x$ is in metre, $t$ is in seconds and $\alpha = 1 \,m/s^2$. The work done during the first $4 \,s$ is (in $J$)

$A$ particle moves from a point $(-2\hat i + 5\hat j) \ m$ to $(4\hat j + 3\hat k) \ m$ when a force of $(4\hat i + 3\hat j) \ N$ is applied. How much work has been done by the force? $J$

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo